Temporary access roads, loading areas and material storage yards can become dusty as delivery lorries and site plant pass over unpaved ground. BIOnoDUST can be considered for these surfaces as part of a dust control plan that adapts as the work moves around the site.

Workers and a dumper beside a building under construction, with dust on the left and a clearer track on the right.
Illustrative comparison.

Trace the dust back to its source

Follow the route a delivery vehicle takes from the gate to the unloading point. Look at the bends, gradients and surfaces where vehicles slow down or turn. Note any dust that drifts towards pedestrian routes, neighbouring properties or the site entrance.

Distinguish dust lifted from unpaved tracks from material carried out on tyres and from dust generated by cutting, demolition or stockpiles. Each source calls for its own controls.

Fit a pilot trial around the work programme

Choose an unpaved section that will remain in use long enough to observe how it behaves. Agree a window around deliveries and ensure there is a clear route for pedestrians and emergency access. Record the surface condition, drainage and expected vehicle movements before the trial.

If a comparable untreated section is available, photograph both from the same points and use that section as a reference.

Review as site traffic changes

Compare visible dust and the condition of the surface under similar traffic and weather. Record heavy deliveries, rainfall and any grading or excavation that may affect the comparison.

Repeat the observation when the site layout changes. The findings can inform where to extend treatment and which routes need maintenance.

Other applications